Rodrigo Schuster Electrical Engineer

Graduated from the University of the Republic in Uruguay, with extensive experience in medium and low voltage engineering projects. Specialized in key areas such as remote control, protection and power. Additionally, he has solid project management experience, successfully leading the planning, execution and delivery of electrical engineering projects.

PROJECTS DESIGNED
Power and Control Panels – OSE Barrio Mónaco No. 10084311
Client: Indus, Uruguay (December 2025)
Power and control panel project for 4 centrifugal pumps and 1 submersible pump. Power: 35 kW @ 400 V
Audit – Comisión Técnica Mixta de Salto Grande
Client: LSQA, Uruguay (November 2025)
Audit of operator training processes in compliance with Resolution 208/98 of the Secretariat of Energy and CAMMESA Technical Procedure No. 15.
Grounding Grid – Coviber Substation
Client: Cooperativa Coviber Norte 4, Uruguay (September 2025)
Design of grounding grid for UTE connection substation.
Control Panels – Punta de Rieles Women’s Prison
Client: Indus, Uruguay (August 2025 – November 2025)
Design of 13 control panels for fans, pumps, motorised valves, and temperature control systems.
Electrical Audit of the Portland Plant in Manga
CLIENT: ANCAP, Uruguay
Soil Remediation Plant
Client: Valgo, France (September 2025 – October 2025)
Detailed engineering and control panel project for decontamination (asbestos and lead removal), soil remediation, and groundwater treatment. Control panel design and power and control cabling for a soil remediation plant in Montevideo, Uruguay Total power: 390 kW @ 400 V.
Electric Vessel Charging System – China Zorrilla
Client: Buquebus, Uruguay (July 2024 – October 2025)
Design of electric vessel charging system. Total power: 15 MW
Station 2017 Salto B (UTE)
Client: YNEL, Uruguay (April 2025 – May 2025)
Detailed engineering of telecontrol and protection systems for the addition of a 31.5 / 6 kV, 10 MVA transformer at the station.
Electrical Audit – Portland Cement Plant, Manga
Client: ANCAP, Uruguay (January 2025 – April 2025)
Survey and assessment of the medium- and low-voltage electrical installation of ANCAP’s Portland cement plant.
Electrical Installation – Cerro Caqueira Pumping Station
Client: MVOT / OSE, Uruguay (March 2025)
Design of the electrical installation for a wastewater pumping station (30 kW)
Drinking water supply electrical installation and instrumentation - Parkway-Sacra Paysandú
CLIENT: MVOT/OSE, Uruguay (September 2024- December 2024)
Design of electrical installation and instrumentation for a drinking water supply system (20 kW). The project involved filling a tank from a semi-artesian well and a pressurization system for water distribution
Sanitation pumping well electrical installation-Borderre Soriano
CLIENT: MVOT/OSE, Uruguay (November 2024)
Sanitation pumping well and drinking water tank. Electrical installation Los Eucaliptus, Maldonado.
CLIENT: MVOT/OSE, Uruguay
Remote control system design for SALTO B 30 kV substation (UTE)
CLIENT: YNEL, Uruguay
Design of the low voltage (LV) line for power supply to workshops and warehouses at the Collahuasi Dsalination Plant, Chile
CLIENT: ADYD Group, SPAIN